This allows for litigation-free and/or unencumbered land to develop their lands into revenue generating commercial properties or spaces. Typically covers
QUALIFIED LAND
A non-negotiable requirement. This land must preferably be located in a prime area or close to commercial centres. We almost always come with the capital and men to get the project off the ground, whilst the jv applicant comes with a litigation-free land.
COMMERCIAL VIABILITY
The only reason why we would come on board in a Joint Venture (JV) partnership, is for the landowner to demonstrate to us that the project(s) make(s) economic sense.
PRE-CONSTRUCTION
It's a plus if any of these are already in place:
- Presale contracts (if build-to-sell)
- Established user base
- Architectural and/or Structural Drawings
- Valid Building Permit
REVENUE SHARING
Pre-agreed post Mandatory Preconstruction Checks. The value of the land is known, in addition to the project cost (Project Cost + Bill of Quantities + Preconstruction Cost), to know the revenue sharing arrangement.
ONBOARDING PROCESS
It follows the typically three(3) main construction phases:
1. PRE-CONSTRUCTION
2. CONSTRUCTION, and
3. POST-CONSTRUCTION
1. PRE-CONSTRUCTION
The following pre-construction stages are followed:
i. Simple Online Application Here:
ii. Mandatory Preconstruction Checks: You can do these checks yourself and submit the details to us, or avail of our paid BNPL-Assisted Checks at a one-time fee of GHs6,000.
iii. Pre-Construction Meetings (In-Person and Online)
iv. Contract Signing
v. Architectural & Structural Drawings Production (if already not available)
vi. Procurement of Valid Building Permit
2. CONSTRUCTION
Once the contract has been signed, we mobilize to move building materials to site, to start the construction process.
3. POST-CONSTRUCTION
Purpose of the project will be allocated it's use, to start collecting revenue. Revenue will be shared or disbursed in the arrangement pre-agreed in the contract that was signed at the pre-construction stage.
APPLICABLE FEES
Platform fee: GHs2,000 (Mandatory)
BNPL-Assisted Checks: GHs6,000 (Optional if opting for Self-Administered Checks)
Kindly take note that it's not compulsory to pay us to do the mandatory preconstruction checks for you as you can do these checks yourself and submit the results to us - but if you want us to conduct these checks for you, it comes at a one-time fee of GHs6,000.
There's a one-time non-refundable fee of GHs2,000, if you do the mandatory preconstruction checks yourself and submit it to us - but if you choose the BNPL-Assisted Checks option, you don't have to pay the platform fee of GHs2,000 in addition to the assisted checks fee of GHs6,000.